[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Tugas Akhir Mahasiswa

Pertiwi, Sabilla Syahrani (2023) ANALISIS PENGARUH HAMBATAN KERJA TERHADAP EFISIENSI WAKTU DENGAN METODE PRODUCTIVITY RATING PADA PROYEK PEMBANGUNAN SKYBRIDGE STASIUN KERETA API PURWOKERTO. S1 thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

This list was generated on Wed Jul 15 20:34:51 2026 WIB.