ADI, PUPUT SAPTO (2018) ANALISIS KINERJA RUAS JALAN DR. GUMBREG PURWOKERTO. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
COVER_PUPUT SAPTO ADE_TS'18.pdf
Download (2MB)
BAB I_PUPUT SAPTO ADE_TS'18.pdf
Download (731kB)
BAB II_PUPUT SAPTO ADE_TS'18.pdf
Download (957kB)
BAB III_PUPUT SAPTO ADE_TS'18.pdf
Restricted to Registered users only
Download (837kB)
BAB IV_PUPUT SAPTO ADE_TS'18.pdf
Restricted to Registered users only
Download (1MB)
BAB V_PUPUT SAPTO ADE_TS'18.pdf
Restricted to Registered users only
Download (714kB)
DAFTAR PUSTAKA_PUPUT SAPTO ADE_TS'18.pdf
Download (739kB)
LAMPIRAN_PUPUT SAPTO ADE_TS'18.pdf
Restricted to Registered users only
Download (1MB)
Abstract
Dr. Gumbreg Purwokerto Road is an undivided two-lane two-way street with
a width of 5.5 metres and a length of 1.2 kilometres. The large number of vehicles
passing and entering the road, especially on certain hours, as well as the bustle
alongside the road influence the performance of the road itself. Therefore, an
analysis study is needed to analyse the performance of Dr. Gumbreg Purwokerto
Road. This research is expected to be able to find out the performance of the road’s
existing condition and the next 10 years’ condition. The research used a survey
method. It surveys the traffic volume. The data are analysed through the Indonesia
Highway Capacity Manual (1997) to obtain the value of light-vehicle’s free flow
velocity (FV), Degree of Saturation (DS), and the road srvice level. The research
result of the existing condition shows that the (FV) is 38.92 km/hour, the (DS) is
0.55 and the service level is C category. This means that it belongs to unsaturated
condition. The analysis of the next 10 years (without any change) road performance
(2028) shows that the (FV) is 38.92 km/hour, the DS is 1.19 and the service level is
F category. This means that it belongs to satured condition. After two scenarios,
scenario I and scenario II, were conducted, it reveals that scenario II is the best
scenario (by widening the track to 8 meters, separating the entrance and the exit of
Margono Soekarjo Hospital, and installing the traffic signs). Scenario application
obtains the (FV) of 44.56 km/hour, the (DS) 0f 0.70, and the service level of C
category. Thus, this means that it belongs to a stable condition.
| Dosen Pembimbing: | unspecified | unspecified |
|---|---|
| Item Type: | Thesis (Bachelor) |
| Additional Information: | Pembimbing: Sulfah Anjarwati, S.T., M.T., dan Juanita, S.T., M.T. |
| Uncontrolled Keywords: | road performance, the free-flow velocity of light-vehicles, Degree of Saturation, road service level |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
| Depositing User: | Iin Hayuningtyas |
| Date Deposited: | 04 Jan 2019 02:23 |
| Last Modified: | 14 May 2024 01:27 |
| URI: | http://repository.ump.ac.id/id/eprint/8405 |
