Utami, Aisyah Nur (2022) Analisis Manajemen Sisa Material Konstruksi Pada Proyek Pembangunan Kantor Kejaksaan Cilacap. S1 thesis, Universitas Muhammadiyah Purwokerto.
Aisyah Nur Utami_Cover.pdf
File Pdf (2MB)
Aisyah Nur Utami_BAB I.pdf
File Pdf (824kB)
Aisyah Nur Utami_BAB II.pdf
File Pdf (1MB)
Aisyah Nur Utami_BAB III.pdf
Restricted to Registered users only
File Pdf (1MB)
Aisyah Nur Utami_BAB IV.pdf
Restricted to Registered users only
File Pdf (1MB)
Aisyah Nur Utami_BAB V.pdf
Restricted to Registered users only
File Pdf (820kB)
Aisyah Nur Utami_Daftar Pustaka.pdf
File Pdf (818kB)
Aisyah Nur Utami_Lampiran.pdf
Restricted to Registered users only
File Pdf (6MB)
Abstract
Various important factors, such as material, substantially impact how much it will
cost to complete a project. It is common for residual material to be created during
project execution; while this cannot be avoided, it can be lessened. This study aims to
determine the predominant materials used, the underlying causes, and potential
solutions to the problem of residual material. In this study, descriptive quantitative
approaches are used. According to a study employing Pareto analysis, PVC pipe type
AW Ø4” (waste level: 63,57%, cost of waste material: Rp. 10.680.000) and bricks
(waste level: 6,31%, cost of waste material: Rp. 8.796.008) are the two most prevalent
materials for the residual material. The reasons for the residual Ø4" type AW PVC
pipe material were incorrect calculations made during the procurement of the material
and out-of-date shortcuts. Meanwhile, transportation-related damage, improper site
planning, and excessive cutting result in the production of bricks. The control activities
include developing calculation plans, coordinating modules, optimizing cutting,
planning suitable layouts, and reaching agreements with suppliers. The supplier is
responsible if the material is damaged during shipping.
| Dosen Pembimbing: | Azizi, Amris and Suksmono, Arif Kurniawan | nidn 0607066701, nidn 0615037802 |
|---|---|
| Item Type: | Thesis (S1) |
| Uncontrolled Keywords: | Management, Waste Material, Attorney Office |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
| Depositing User: | Catur Indra Himawan |
| Date Deposited: | 06 Jan 2023 02:52 |
| Last Modified: | 22 Apr 2025 03:09 |
| URI: | http://repository.ump.ac.id/id/eprint/15085 |
