YUWONO, SIDIQ AJI (2022) ANALISA LENGKUNG HORIZONTAL JALAN RAYA CIKEMBULAN Sta. 50+650 s/d Sta. 50+850 KECAMATAN KAWUNGANTEN, KABUPATEN CILACAP. S1 thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
SIDIQ AJI YUWONO_HALAMAN_COVER.pdf
File Pdf (1MB)
SIDIQ AJI YUWONO_BAB I.pdf
File Pdf (618kB)
SIDIQ AJI YUWONO_BAB II.pdf
File Pdf (1MB)
SIDIQ AJI YUWONO_BAB III.pdf
Restricted to Registered users only
File Pdf (849kB)
SIDIQ AJI YUWONO_BAB IV.pdf
Restricted to Registered users only
File Pdf (1MB)
SIDIQ AJI YUWONO_BAB V.pdf
Restricted to Registered users only
File Pdf (529kB)
SIDIQ AJI YUWONO_Daftar Pustaka.pdf
File Pdf (764kB)
SIDIQ AJI YUWONO_Lampiran.pdf
Restricted to Registered users only
File Pdf (3MB)
Abstract
The purpose of this study was to analyze and evaluate the magnitude of the Horizontal Alignment on the Cikembulan Road, Cilacap Regency by adjusting the 1997 Intercity Road Geometry Planning Standard. existing on the road to be reviewed. In this study, it was carried out on the national road, Jalan Raya Cikembulan, Kawunganten District, Cilacap Regency. The results of this study show that the radius of the bend on the national road section of Jalan Raya Cikembulan, Kawunganten District, Cilacap Regency, when viewed from the planned speed of Vr 80 km/hour, the radius data obtained at bend I is too small (114.591 m). and on the south ring road section, the percentage of slope is obtained, according to what is in the field, which is 0.186% with the slope being a flat field.
| Dosen Pembimbing: | ANJARWATI, SULFAH and ISKAHAR, ISKAHAR | nidn0618027501, nidn0608087502 |
|---|---|
| Item Type: | Thesis (S1) |
| Uncontrolled Keywords: | Horizontal Alignment, Cikembulan Road |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
| Depositing User: | wulan |
| Date Deposited: | 19 Oct 2022 03:51 |
| Last Modified: | 19 Oct 2022 03:51 |
| URI: | http://repository.ump.ac.id/id/eprint/14539 |
