ANALISIS PERSEDIAAN BAHAN BAKU TEBU PADA PABRIK GULA SRAGI PT. PERKEBUNAN NUSANTARA IX (PERSERO) KABUPATEN PEKALONGAN

PURNAMASARI, TUVA YULIA (2020) ANALISIS PERSEDIAAN BAHAN BAKU TEBU PADA PABRIK GULA SRAGI PT. PERKEBUNAN NUSANTARA IX (PERSERO) KABUPATEN PEKALONGAN. S1 thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

[img] Text
TUVA YULIA PURNAMASARI_Cover.pdf

Download (1MB)
[img] Text
TUVA YULIA PURNAMASARI_BAB 1.pdf

Download (785kB)
[img] Text
TUVA YULIA PURNAMASARI_BAB 2.pdf

Download (1MB)
[img] Text
TUVA YULIA PURNAMASARI_BAB 3.pdf
Restricted to Repository staff only

Download (962kB)
[img] Text
TUVA YULIA PURNAMASARI_BAB 4.pdf
Restricted to Repository staff only

Download (858kB)
[img] Text
TUVA YULIA PURNAMASARI_BAB 5.pdf
Restricted to Repository staff only

Download (970kB)
[img] Text
TUVA YULIA PURNAMASARI_BAB 6.pdf
Restricted to Repository staff only

Download (774kB)
[img] Text
TUVA YULIA PURNAMASARI_Daftar Pustaka.pdf

Download (778kB)

Abstract

This research aimed to 1) Find out the process of sugar production in Sragi Sugar Factory in Pekalongan Regency; 2) Find out the raw material supply at Sragi Sugar Factory which consisted of the number of economic orders, safety stock and reorder points; 3) Find out the cost efficiency of raw material supply at Sragi Sugar Factory in Pekalongan Regency. It was used a case study methods. The data were collected by doing interviews, observations and documentation. EOQ Analysis, Safety Stock, Reorder Point and Cost Efficiency were used to determine the supply of sugar cane raw material supply at Sragi Sugar Factory in Pekalongan Regency. The results showed that 1) The average amount of sugar cane raw material supply according to EOQ method was 2,520.14 tons, it did not have a safety stock and the reorder point value was 1,401.47 tons; 2) The average difference in the total cost of sugar cane raw material supply after using EOQ method with the average total cost of sugar cane raw material supply was 3,23 billion rupiah; 3) The amount of sugar cane raw material supply was not economical with no safety stock and the reorder point value was in the same position as the amount of the available sugar cane raw material supply at Sragi Sugar Factory; 4) The total cost of sugar cane raw material supply in procuring the supply had not reached an efficient level.

Item Type: Thesis (S1)
Uncontrolled Keywords: sugar cane, supply, raw materials, EOQ analysis, reorder point
Subjects: S Agriculture > S Agriculture (General)
Divisions: Fakultas Pertanian dan Perikanan > Agribisnis S1
Depositing User: wulan
Date Deposited: 01 Sep 2022 04:27
Last Modified: 01 Sep 2022 04:27
URI: https://repository.ump.ac.id:80/id/eprint/13930

Actions (login required)

View Item View Item