GUNARTO, BAKTI (2012) ANALISIS KEBUTUHAN AIR BERSIH DI KOMPLEK PERUMAHAN SOGRA PURI INDAH. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

[thumbnail of BAKTI GUNARTO COVER.pdf]
Preview
Text
BAKTI GUNARTO COVER.pdf

Download (544kB) | Preview
[thumbnail of BAKTI GUNARTO BAB I.pdf]
Preview
Text
BAKTI GUNARTO BAB I.pdf

Download (650kB) | Preview
[thumbnail of BAKTI GUNARTO BAB II.pdf]
Preview
Text
BAKTI GUNARTO BAB II.pdf

Download (1MB) | Preview
[thumbnail of BAKTI GUNARTO BAB III.pdf] Text
BAKTI GUNARTO BAB III.pdf
Restricted to Registered users only

Download (661kB)
[thumbnail of BAKTI GUNARTO BAB IV.pdf] Text
BAKTI GUNARTO BAB IV.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of BAKTI GUNARTO BAB V.pdf] Text
BAKTI GUNARTO BAB V.pdf
Restricted to Registered users only

Download (512kB)
[thumbnail of BAKTI GUNARTO DAFTAR PUSTAKA.pdf]
Preview
Text
BAKTI GUNARTO DAFTAR PUSTAKA.pdf

Download (535kB) | Preview
[thumbnail of BAKTI GUNARTO LAMPIRAN.pdf] Text
BAKTI GUNARTO LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB)

Abstract

Many of residential area development in the form of housing collectively. In almost every housing estate in Purwokerto consume clean water from a drinking water Company Banyumas. This demand to increase the provision of the service PDAM into clean water either through improvement networks and increase the capacity of discharge piping of water provided. The haousing has not been entirely Sogra Puri Indah subscription clean water and most likely later PADM residents in housing will subscribe Sogra Puri Indah water PADM in their entirety. Thus PDAM should also be ready to anticipate how much clean water flowed into the Housing Sogra Puri Indah as a whole.
To find out the distribution of water on a debit network then please note debit used to input from the network with reference to lay out pipe diameter and network, the length of the pipe. And thanthe debit data input withmethod distributed eachsegment. While debit required is determined from the number of house connections.
With the input of 0,00392865 m3 debit/dt to SR 154, while for 186 of house connections needs a 0,00392865 m3/dt, so debit increase required is amounted to 0,0030332 m3/dt. With the debit entry is still very lacking to reach a whole house in Sograpuriindah housing,Then the PDAM of Banyumas district need to prepare fordebit the amount required.

Dosen Pembimbing: unspecified | unspecified
Item Type: Thesis (Bachelor)
Additional Information: Pembimbing: Agus Salim, S.T., M.T. dan Sulfah Anjarwati, S.T., M.T.
Uncontrolled Keywords: Kebutuhan Air Bersih
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Tekniik Dan Sains > Teknik Sipil S1
Depositing User: Dan Kh
Date Deposited: 16 Jan 2018 01:13
Last Modified: 05 Aug 2024 03:16
URI: http://repository.ump.ac.id/id/eprint/7045

Actions (login required)

View Item View Item