GUNARTO, BAKTI (2012) ANALISIS KEBUTUHAN AIR BERSIH DI KOMPLEK PERUMAHAN SOGRA PURI INDAH. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
Preview |
Text
BAKTI GUNARTO COVER.pdf Download (544kB) | Preview |
Preview |
Text
BAKTI GUNARTO BAB I.pdf Download (650kB) | Preview |
Preview |
Text
BAKTI GUNARTO BAB II.pdf Download (1MB) | Preview |
![]() |
Text
BAKTI GUNARTO BAB III.pdf Restricted to Registered users only Download (661kB) |
![]() |
Text
BAKTI GUNARTO BAB IV.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
BAKTI GUNARTO BAB V.pdf Restricted to Registered users only Download (512kB) |
Preview |
Text
BAKTI GUNARTO DAFTAR PUSTAKA.pdf Download (535kB) | Preview |
![]() |
Text
BAKTI GUNARTO LAMPIRAN.pdf Restricted to Registered users only Download (1MB) |
Abstract
Many of residential area development in the form of housing collectively. In almost every housing estate in Purwokerto consume clean water from a drinking water Company Banyumas. This demand to increase the provision of the service PDAM into clean water either through improvement networks and increase the capacity of discharge piping of water provided. The haousing has not been entirely Sogra Puri Indah subscription clean water and most likely later PADM residents in housing will subscribe Sogra Puri Indah water PADM in their entirety. Thus PDAM should also be ready to anticipate how much clean water flowed into the Housing Sogra Puri Indah as a whole.
To find out the distribution of water on a debit network then please note debit used to input from the network with reference to lay out pipe diameter and network, the length of the pipe. And thanthe debit data input withmethod distributed eachsegment. While debit required is determined from the number of house connections.
With the input of 0,00392865 m3 debit/dt to SR 154, while for 186 of house connections needs a 0,00392865 m3/dt, so debit increase required is amounted to 0,0030332 m3/dt. With the debit entry is still very lacking to reach a whole house in Sograpuriindah housing,Then the PDAM of Banyumas district need to prepare fordebit the amount required.
Dosen Pembimbing: | unspecified | unspecified |
---|---|
Item Type: | Thesis (Bachelor) |
Additional Information: | Pembimbing: Agus Salim, S.T., M.T. dan Sulfah Anjarwati, S.T., M.T. |
Uncontrolled Keywords: | Kebutuhan Air Bersih |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
Depositing User: | Dan Kh |
Date Deposited: | 16 Jan 2018 01:13 |
Last Modified: | 05 Aug 2024 03:16 |
URI: | http://repository.ump.ac.id/id/eprint/7045 |
Actions (login required)
![]() |
View Item |