ZURROHMAN, ABDUL AZIZ (2017) ANALISIS PERBAIKAN SUSUT ENERGI PADA JARINGAN MENENGAH PENYULANG KALIBAKAL 03 DI PT. PLN (PERSERO) AREA PURWOKERTO. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
Preview |
Text
COVER_ABDUL AZIZ ZURROHMAN_TE'17.pdf Download (2MB) | Preview |
Preview |
Text
BAB I_ABDUL AZIZ ZURROHMAN_TE'17.pdf Download (712kB) | Preview |
Preview |
Text
BAB II_ABDUL AZIZ ZURROHMAN_TE'17.pdf Download (417kB) | Preview |
![]() |
Text
BAB III_ABDUL AZIZ ZURROHMAN_TE'17.pdf Restricted to Repository staff only Download (169kB) |
![]() |
Text
BAB IV_ABDUL AZIZ ZURROHMAN_TE'17.pdf Restricted to Repository staff only Download (403kB) |
![]() |
Text
BAB V_ABDUL AZIZ ZURROHMAN_TE'17.pdf Restricted to Repository staff only Download (128kB) |
Preview |
Text
DAFTAR PUSTAKA_ABDUL AZIZ ZURROHMAN_TE'17.pdf Download (98kB) | Preview |
![]() |
Text
LAMPIRAN_ABDUL AZIZ ZURROHMAN_TE'17.pdf Restricted to Repository staff only Download (777kB) |
Abstract
on the power grid, from generation, transmission, to distribution to
the customer. Based on information from PT. PLN (Persero), most of the electric
energy losses are found in the distribution network. Therefore the shrinkage in the
network system needs to be taken into account more thoroughly. Depreciation
becomes an important discussion at this time because it is related to the quality of
power that will be delivered to the consumer as well as open the potential revenue
for the Perusahaan Listrik Negara (PLN) because losses that occur in the network
will reduce the potential sales by PLN. In this final project is analyzed and effort
of energy shrinkage improvement in one of the repeater in Unit Pelayanan
Jaringan (UPJ) Purwokerto that is feeder Kalibakal 03 using ETAP 12.6.0
softwere. Based on the results of analysis and simulation by upgrading or
changing the cable channel size, there is a loss of power loss from 33 kW to 17
kW. Meanwhile, losses energy losses from 3.09% to 2.8%. There was a decline
from 19,198.08 kWh to 9,889.92 kWh. The magnitude of economic losses also
decreased from Rp. 28.009.998,72 to Rp. 14,429,393,28.
Dosen Pembimbing: | unspecified | unspecified |
---|---|
Item Type: | Thesis (Bachelor) |
Additional Information: | Pembimbing: Winarso, S.T., M.Eng., dan Arif Johar Taufiq, S.T., M.T. |
Uncontrolled Keywords: | Energy losses, medium voltage network, ETAP power station, upgrading |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Fakultas Tekniik Dan Sains > Teknik Elektro S1 |
Depositing User: | Iin Hayuningtyas |
Date Deposited: | 30 Oct 2017 02:02 |
Last Modified: | 30 Oct 2017 02:02 |
URI: | http://repository.ump.ac.id/id/eprint/5014 |
Actions (login required)
![]() |
View Item |