ANALISIS PERBAIKAN SUSUT ENERGI PADA JARINGAN MENENGAH PENYULANG KALIBAKAL 03 DI PT. PLN (PERSERO) AREA PURWOKERTO

ZURROHMAN, ABDUL AZIZ (2017) ANALISIS PERBAIKAN SUSUT ENERGI PADA JARINGAN MENENGAH PENYULANG KALIBAKAL 03 DI PT. PLN (PERSERO) AREA PURWOKERTO. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

[img]
Preview
Text
COVER_ABDUL AZIZ ZURROHMAN_TE'17.pdf

Download (2MB) | Preview
[img]
Preview
Text
BAB I_ABDUL AZIZ ZURROHMAN_TE'17.pdf

Download (712kB) | Preview
[img]
Preview
Text
BAB II_ABDUL AZIZ ZURROHMAN_TE'17.pdf

Download (417kB) | Preview
[img] Text
BAB III_ABDUL AZIZ ZURROHMAN_TE'17.pdf
Restricted to Repository staff only

Download (169kB)
[img] Text
BAB IV_ABDUL AZIZ ZURROHMAN_TE'17.pdf
Restricted to Repository staff only

Download (403kB)
[img] Text
BAB V_ABDUL AZIZ ZURROHMAN_TE'17.pdf
Restricted to Repository staff only

Download (128kB)
[img]
Preview
Text
DAFTAR PUSTAKA_ABDUL AZIZ ZURROHMAN_TE'17.pdf

Download (98kB) | Preview
[img] Text
LAMPIRAN_ABDUL AZIZ ZURROHMAN_TE'17.pdf
Restricted to Repository staff only

Download (777kB)

Abstract

on the power grid, from generation, transmission, to distribution to the customer. Based on information from PT. PLN (Persero), most of the electric energy losses are found in the distribution network. Therefore the shrinkage in the network system needs to be taken into account more thoroughly. Depreciation becomes an important discussion at this time because it is related to the quality of power that will be delivered to the consumer as well as open the potential revenue for the Perusahaan Listrik Negara (PLN) because losses that occur in the network will reduce the potential sales by PLN. In this final project is analyzed and effort of energy shrinkage improvement in one of the repeater in Unit Pelayanan Jaringan (UPJ) Purwokerto that is feeder Kalibakal 03 using ETAP 12.6.0 softwere. Based on the results of analysis and simulation by upgrading or changing the cable channel size, there is a loss of power loss from 33 kW to 17 kW. Meanwhile, losses energy losses from 3.09% to 2.8%. There was a decline from 19,198.08 kWh to 9,889.92 kWh. The magnitude of economic losses also decreased from Rp. 28.009.998,72 to Rp. 14,429,393,28.

Item Type: Thesis (Bachelor)
Additional Information: Pembimbing: Winarso, S.T., M.Eng., dan Arif Johar Taufiq, S.T., M.T.
Uncontrolled Keywords: Energy losses, medium voltage network, ETAP power station, upgrading
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Teknik Elektro S1
Depositing User: Iin Hayuningtyas
Date Deposited: 30 Oct 2017 02:02
Last Modified: 30 Oct 2017 02:02
URI: https://repository.ump.ac.id:80/id/eprint/5014

Actions (login required)

View Item View Item