BARIAN, INDRA DWI (2017) ANALISIS PERBANDINGAN BIAYA DAN WAKTU, PEKERJAAN BEKISTING PELAT LANTAI MENGGUNAKAN KAYU (MULTIPLEX) DAN PELAT BONDEK. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
Preview |
Text
COVER_INDRA DWI BARIAN_TS'17.pdf Download (1MB) | Preview |
Preview |
Text
BAB I_INDRA DWI BARIAN_TS'17.pdf Download (694kB) | Preview |
Preview |
Text
BAB II_INDRA DWI BARIAN_TS'17.pdf Download (825kB) | Preview |
![]() |
Text
BAB III_INDRA DWI BARIAN_TS'17.pdf Restricted to Registered users only Download (795kB) |
![]() |
Text
BAB IV_INDRA DWI BARIAN_TS'17.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
BAB V_INDRA DWI BARIAN_TS'17.pdf Restricted to Registered users only Download (617kB) |
Preview |
Text
DAFTAR PUSTAKA_INDRA DWI BARIAN_TS'17.pdf Download (619kB) | Preview |
![]() |
Text
LAMPIRAN_INDRA DWI BARIAN_TS'17.pdf Restricted to Registered users only Download (3MB) |
Abstract
Development of Construction service in Indonesia nowadays is increasing massively.
Considering such massive development, construction companies strive to win the
competition by improving their product or service quality. One of construction
projects to develop is the plate construction job. Bondek plate is a combination of
plates using steel deck as substitution of positive bending moment where it also
functioned as plate formwork and workshop floor. Conventional plate formwork is a
wooden formwork that is constructed into a united formwork. Plate job is a part of
construction that takes time in the process of construction. So, this research aimed to
compare the cost and working time of Slab job using wood (multiplex) with Slab of
Bondek. The method of this research was analysis of unit price of Job based on
Indonesian National Standard 2016. The findings show that Slab Formwork job
using Bondek plate is more economical than the formwork using wood (multiplex)
with price gap of Rp 35.140.300,-. The processing time of Bondek plate is more
efficient than the wooden plate Formwork (multiplex).
Dosen Pembimbing: | unspecified | unspecified |
---|---|
Item Type: | Thesis (Bachelor) |
Additional Information: | Pembimbing: H.M. Agus Salim A.F., S.T., M.T, dan Amris Azizi., S.T., M.Si. |
Uncontrolled Keywords: | Conventional Plate Formwork, Bondek plate, Cost, Working Time |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
Depositing User: | Iin Hayuningtyas |
Date Deposited: | 02 Oct 2017 00:42 |
Last Modified: | 01 Jul 2024 03:16 |
URI: | http://repository.ump.ac.id/id/eprint/4450 |
Actions (login required)
![]() |
View Item |