PENGARUH PELAKSANAAN KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA TENAGA KERJA PROYEK KONSTRUKSI PADA PEMBANGUNAN PASAR PROJO AMBARAWA, JAWA TENGAH

CHOERUDDIN, . (2014) PENGARUH PELAKSANAAN KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA TENAGA KERJA PROYEK KONSTRUKSI PADA PEMBANGUNAN PASAR PROJO AMBARAWA, JAWA TENGAH. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

[img]
Preview
Text
Cover_Choeruddin.pdf

Download (1MB) | Preview
[img]
Preview
Text
Bab I_Choeruddin.pdf

Download (603kB) | Preview
[img]
Preview
Text
Bab II_Choeruddin.pdf

Download (685kB) | Preview
[img] Text
Bab III_Choeruddin.pdf
Restricted to Repository staff only

Download (902kB)
[img] Text
Bab IV_Choeruddin.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
Bab V_Choeruddin.pdf
Restricted to Repository staff only

Download (576kB)
[img]
Preview
Text
Daftar Pustaka_Choeruddin.pdf

Download (577kB) | Preview
[img] Text
Lampiran_Choeruddin.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

To get the labours that are able to compete is not an easy thing. Health and safety at Work (K3) must be considered as the most important dealing with the labors’ welfare. This research is aimed to find out whether there was an effect implementation of health and safety at work (K3) toward the performance of the construction project labors of PT. Reka Esti Utama Semarang. The implementation of health and safety at work had an important role in forming the labors’ attiude in doing their duties. If a company implements it well, the company will get the benefits from it. The data used in this research was from questionnaire (primary) and some observation of the labors of PT. Reka Esti Utama Semarang. The analysis technique used was by double linear regression using hypothesis test, namely F and T test. The result of the research showed that simultaneous and partial free variables consisting of X1-X6 or top management commitment (X1), the procedure and rules of K3 (X2), labors’ communication (X3), labors’ competence (X4), labors’ environment (X5), and labors’ participation (X6) influenced significantly toward performance of the construction project labors (Y) that was 95,2 %, the rest 4,8 % was influenced by the variables which were not related with this research. The most influencing variable was top management commitment (X1), with 12.470

Item Type: Thesis (Bachelor)
Additional Information: Pembimbing: Amris Azizi, S.T., M.Si. dan Agus Salim, S.T., M.T.
Uncontrolled Keywords: K3, performance, labor, construction
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Nur Hardiansyah
Date Deposited: 22 Aug 2017 05:25
Last Modified: 22 Aug 2017 05:25
URI: https://repository.ump.ac.id:80/id/eprint/3488

Actions (login required)

View Item View Item