AJI, CITRA YUDISTIRA KRESNA (2016) OPTIMASI JUMLAH ARMADA ANGKUTAN UMUM DI WILAYAH PURBALINGGA DITINJAU DARI KELAYAKAN EKONOMI (SETUDI KHUSUS ARMADA ANGKUTAN UMUM TRAYEK BOBOTSARI – PURBALINGGA). Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
CITRA YUDISTIRA KRESNAAJI COVER.pdf
Download (1MB)
CITRA YUDISTIRA KRESNAAJI BAB I.pdf
Download (793kB)
CITRA YUDISTIRA KRESNAAJI BAB II.pdf
Download (652kB)
CITRA YUDISTIRA KRESNAAJI BAB III.pdf
Restricted to Registered users only
Download (806kB)
CITRA YUDISTIRA KRESNAAJI BAB IV.pdf
Restricted to Registered users only
Download (772kB)
CITRA YUDISTIRA KRESNAAJI BAB V.pdf
Restricted to Registered users only
Download (712kB)
CITRA YUDISTIRA KRESNAAJI DAFTAR PUSTAKA.pdf
Download (681kB)
CITRA YUDISTIRA KRESNAAJI LAMPIRAN.pdf
Restricted to Registered users only
Download (1MB)
Abstract
A good public transport should provide effective and efficient services,and able to meet the
public’s need.The users basically want ti have a sufficient service in terms of
safety,comfort,and time efficiency.The objective of the study is to find out the number of
passangers taken by the public transports in the route of Bobotsari-Purbalingga,and to
determine the ideal number of public transports in the route.The mothod in this study is a
survey.The date collection is done by observation and interview to collect the primary and
secondary date.
Based on the analysis,it can be concluded that the number of the public transport in the
route is 22.The maximum passangers in the a day are 15,and the least is 6.The highest
speed is 50 km/hour,and the slowet is 40 km/hour.The everage time of getting on and off is
2,5 mins,and the fastest is a minute.The cycle time is 55 minutes.The average load factor
of the transport in the route is 0,7,indicating that it is not fully occupied.
| Dosen Pembimbing: | unspecified | unspecified |
|---|---|
| Item Type: | Thesis (Bachelor) |
| Additional Information: | Pembimbing: M. Agus Salim.,ST.,MT. dan Sulfah Anjarwati.,ST.,MT. |
| Uncontrolled Keywords: | optimization,feasibility,efficient |
| Subjects: | H Social Sciences > HB Economic Theory T Technology > TL Motor vehicles. Aeronautics. Astronautics |
| Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
| Depositing User: | Nur Hardiansyah |
| Date Deposited: | 11 Jul 2017 01:42 |
| Last Modified: | 20 May 2024 04:24 |
| URI: | http://repository.ump.ac.id/id/eprint/2534 |
