YULIAN, ANGGUN RESTI (2024) ANALISIS PENJADWALAN PELAKSANAAN PEKERJAAN PADA PROYEK PEMBANGUNAN GEDUNG DENGAN METODE FAST TRACK (Studi Kasus : Proyek Pembangunan Indogrosir Purwokerto). S1 thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

Text
ANGGUN RESTI YULIAN_COVER.pdf

File Pdf (1MB)
Text
ANGGUN RESTI YULIAN_BAB I.pdf

File Pdf (1MB)
Text
ANGGUN RESTI YULIAN_BAB II.pdf

File Pdf (1MB)
Text
ANGGUN RESTI YULIAN_BAB III.pdf
Restricted to Registered users only

File Pdf (1MB)
Text
ANGGUN RESTI YULIAN_BAB IV.pdf
Restricted to Registered users only

File Pdf (1MB)
Text
ANGGUN RESTI YULIAN_BAB V.pdf
Restricted to Registered users only

File Pdf (1MB)
Text
ANGGUN RESTI YULIAN_DAFTAR PUSTAKA.pdf

File Pdf (1MB)
Text
ANGGUN RESTI YULIAN_LAMPIRAN.pdf
Restricted to Registered users only

File Pdf (2MB)

Abstract

One strategy that can be used to accelerate time is to apply the Fast Track method in scheduling, so as to reduce the duration of project implementation. This Fast Track method requires work that is usually done sequentially to be done simultaneously, while still paying attention to the logical relationship between activities. The object in this fast track method scheduling analysis research is the Indogrosir Purwokerto Building Project. The purpose of this study is to determine when the estimated project completion time due to the application of the fast track method on the Indogrosir Purwokerto Building Project which has a work duration of 237 days and is completed exactly on the 237th day. In preparing this report, quantitative methods are used. The data needed in the analysis are time schedules, weekly reports, work volumes, and drawings for work that is on the initial critical trajectory. From the results of research conducted in 2 stages using Microsoft Project 2019 software, it was found that the acceleration was 21 days faster than the previous scheduling, so that the total duration was 216 days.

Dosen Pembimbing: SUKSMONO, ARIF KURNIAWAN and WIBOWO, MUKTI AGUNG | nidn0615037802, nidn0625118605
Item Type: Thesis (S1)
Uncontrolled Keywords: Fast Track, Scheduling, Indogrosir Purwokerto Construction Project
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Tekniik Dan Sains > Teknik Sipil S1
Depositing User: Iin Hayuningtyas
Date Deposited: 09 Dec 2024 07:33
Last Modified: 09 Dec 2024 07:33
URI: http://repository.ump.ac.id/id/eprint/17668

Actions (login required)

View Item
View Item