SAMUDRA, BAGUS MEI SETIAJI (2023) ANALISIS PENGGUNAAN METODE LINE OF BALANCE DAN PRECEDENCE DIAGRAM METHOD PADA PROYEK PEMBANGUNAN GEDUNG II TK SD UNIVERSITAS MUHAMMADIYAH PURWOKERTO. S1 thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

Text
Cover Bagus.pdf

Download (3MB)
Text
Bab I Bagus.pdf

Download (987kB)
Text
Bab II Bagus.pdf

Download (1MB)
Text
Bab III Bagus.pdf
Restricted to Registered users only

Download (989kB)
Text
Bab IV Bagus.pdf
Restricted to Registered users only

Download (1MB)
Text
Bab V Bagus.pdf
Restricted to Registered users only

Download (977kB)
Text
Dapus Bagus.pdf

Download (977kB)
Text
Lampiran Bagus.pdf
Restricted to Registered users only

Download (6MB)

Abstract

Project Management is the process of planning, organizing, leading and controlling company resources to achieve predetermined short-term goals. In construction project management, scheduling is a major role in monitoring, utilizing, and allocating timely use of resources in construction. The construction project for Building II TK SD Muhammadiyah University Purwokerto is a project owned by Muhammadiyah University Purwokerto with an implementing contractor from PT. Krakatau Indah and UMP's Civil Engineering Bureau (BTS) as supervisory consultants. In this research, the calculation of project duration scheduling will be carried out using the Line Of Balance and Precedence Diagram Method. MS.Project software is used to calculate work duration using the Precedence Diagram Method, and for project scheduling calculations the Line Of Balance method uses MS software. Excel. Based on the results of calculating the duration of work on the Construction of Building II Kindergarten SD Muhammadiyah University Purwokerto, the duration results are obtained: the Line Of Balance method with the result that the duration of the work is 396 days starting April 1 2022 to March 4 2023, while the Precedence Diagram Method requires 275 hours days and for the actual Time Schedule requires a duration of 280 days. Therefore the Precedence Diagram Method is the fastest duration method to complete the construction of Building II of Muhammadiyah University Purwokerto Elementary Kindergarten, because the duration of the work is 5 days faster than the estimated actual Time Schedule made by the owner.

Dosen Pembimbing: AFRIANDINI, BESTY and SUKSMONO, ARIF KURNIAWAN | NIDN0617049201, NIDN0615037802
Item Type: Thesis (S1)
Uncontrolled Keywords: Project Management, Line Of Balance, Precedence Diagram Method, Building II TK SD UMP.
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Tekniik Dan Sains > Teknik Sipil S1
Depositing User: Agus Imam
Date Deposited: 09 Oct 2023 07:19
Last Modified: 09 Oct 2023 07:19
URI: http://repository.ump.ac.id/id/eprint/15853

Actions (login required)

View Item
View Item