YUDISTIRA, WIBI (2020) ANALISIS BIAYA PENANGANAN KERUSAKAN JALAN BERDASARKAN METODE BINA MARGA PADA RUAS JALAN LINGKAR AJIBARANG. S1 thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

Text
Cover SKRIPSI_WIBI YUDISTIRA.pdf

Download (1MB)
Text
Bab I SKRIPSI_WIBI YUDISTIRA-2.pdf

Download (923kB)
Text
Bab II SKRIPSI_WIBI YUDISTIRA-3.pdf

Download (1MB)
Text
Bab III SKRIPSI_WIBI YUDISTIRA-4.pdf
Restricted to Registered users only

Download (988kB)
Text
Bab IV SKRIPSI_WIBI YUDISTIRA-5.pdf
Restricted to Registered users only

Download (1MB)
Text
Bab V SKRIPSI_WIBI YUDISTIRA-6.pdf
Restricted to Registered users only

Download (850kB)
Text
Daftar Pustaka SKRIPSI_WIBI YUDISTIRA-7.pdf

Download (909kB)
Text
Lampiran SKRIPSI_WIBI YUDISTIRA-8.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Research on road pavement conditions is one of the stages to determine the type of evaluation program that needs to be carried out. This research aims to know about the value of the pavement conditions, road demage handling, estimated cost handling on segment the circle road at Ajibarang. The data used secondary previous form year’s research (Aldi Sasongko,2019). The handling of the road damage referring to standard road repairs of Bina Marga Directorate General 2011 and handling, for damage costs referring to AHSP Public Work Service Banyumas District 2020.
The result of this research is the handling : Rp. 6.873.544,07 /M2; Thin Resurfacing Rp. 446.589.355,07/M2; Patch Repair : Rp. 620.567.552,31/M2; Mobilization Rp. 7.580.000,00 and Occupational Health and Safety Rp. 10.037.500,00 so the total amount of handling costs obtained on segment the circle road at Ajibarang Rp. 1.091.647.951,77 and the handling planned of 28 days with the handling method K1 is carried out for 7 days in the third week, thin surfacing is carried out for 7 days in the fourth week, and the method of K3 is carried out for 14 days in the first week.

Dosen Pembimbing: Anjarwati, Sulfah | nidn0618027501
Item Type: Thesis (S1)
Uncontrolled Keywords: Bina Marga, Damage Handling, Handling Costs, Handling time, Road Damage
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Tekniik Dan Sains > Teknik Sipil S1
Depositing User: Agus Imam
Date Deposited: 12 Sep 2022 02:02
Last Modified: 12 Sep 2022 02:02
URI: http://repository.ump.ac.id/id/eprint/14052

Actions (login required)

View Item
View Item