ANHARI, IQBAAL (2020) TINJAUAN ULANG TATA LETAK JALUR STASIUN KROYA UNTUK MENDUKUNG OPERASIONAL JALUR GANDA LINTAS LAYANAN KROYA-KUTOARJO. S1 thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
![]() |
Text
IQBAAL ANHARI_Cover.pdf Download (4MB) |
![]() |
Text
IQBAAL ANHARI_BAB 1.pdf Download (825kB) |
![]() |
Text
IQBAAL ANHARI_BAB 2.pdf Download (1MB) |
![]() |
Text
IQBAAL ANHARI_BAB 3.pdf Restricted to Repository staff only Download (1MB) |
![]() |
Text
IQBAAL ANHARI_BAB 4.pdf Restricted to Repository staff only Download (2MB) |
![]() |
Text
IQBAAL ANHARI_BAB 5.pdf Restricted to Repository staff only Download (813kB) |
![]() |
Text
IQBAAL ANHARI_Daftar Pustaka.pdf Download (792kB) |
Abstract
Kroya Station (KYA) is a large-class type B train station located in Bajing, Kroya, Cilacap, Central Java Province. Kroya Station is located at km 402 + 776 located at a height of +11 meters above sea level, including in the Purwokerto V Operation Area. To be able to support the operation of multiple railway lines, it is necessary to restructure the location of the lines at Kroya Station which includes the layout of the station lines, the effective length of the train lines, and the station platform. Analysis of the layout review of the dual railway at Kroya Station using secondary data obtained from the contractor PT. Hapsaka Mas - PT. Bahana Suprindo Kreasi, KSO in the improvement activities of the south Java cross railroad II. The effective length of the train line at Kroya Station is calculated based on the longest passenger train series that stops at Kroya Station by knowing GAPEKA 2017. The results of the study show that the layout of the lane lines is 9 lanes namely: in the existing condition of the highway lane located on lanes 2 and 3 after the highway station rearrangement is in lanes 4 and 5 and the badug lane is in lanes 2 and 3. Increasing the number of 1:10 notes from 20 notes to 22 notes and 1:12 notes from 2 notes becomes 17 points. Improved railroad reorganization to support operations by providing effective lane length: Lane (1) 614,212 m, lane (2) 613,596 m, lane (3) 805,106 m, lane (4) 905,506 m, lane (5) 628,056 m, lane (6) 531,966 m, lane (7) 369,242 m, lane (8) 286,138 m and lane (9) 195,421 m. The increase in the type of low platform to high platform was 3 units with a platform length of 300 m and width of 3m.
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Station Line Layout, Effective Line, Platform |
Subjects: | T Technology > TF Railroad engineering and operation |
Divisions: | Fakultas Teknik > Teknik Sipil S1 |
Depositing User: | wulan |
Date Deposited: | 31 Aug 2022 02:15 |
Last Modified: | 31 Aug 2022 02:15 |
URI: | https://repository.ump.ac.id:80/id/eprint/13854 |
Actions (login required)
![]() |
View Item |