ANALISA PENGENDALIAN PROYEK DENGAN MENGGUNAKAN METODE NILAI HASIL (EARNED VALUE) PADA PROYEK PENINGKATAN JALAN GENTAWANGI-GERDUREN

PRASMADITYA, RIFQI (2021) ANALISA PENGENDALIAN PROYEK DENGAN MENGGUNAKAN METODE NILAI HASIL (EARNED VALUE) PADA PROYEK PENINGKATAN JALAN GENTAWANGI-GERDUREN. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

[img] Text
Cover Rifqi Prasmaditya_1403010067.pdf

Download (2MB)
[img] Text
Bab I Rifqi Prasmaditya_1403010067-2.pdf

Download (890kB)
[img] Text
Bab II Rifqi Prasmaditya_1403010067-3.pdf

Download (2MB)
[img] Text
Bab III Rifqi Prasmaditya_1403010067-4.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
Bab IV Rifqi Prasmaditya_1403010067-5.pdf
Restricted to Repository staff only

Download (3MB)
[img] Text
Bab V Rifqi Prasmaditya_1403010067-6.pdf
Restricted to Repository staff only

Download (803kB)
[img] Text
Dapus Rifqi Prasmaditya_1403010067-7.pdf

Download (673kB)
[img] Text
Lampiran Rifqi Prasmaditya_1403010067-7.pdf
Restricted to Repository staff only

Download (6MB)

Abstract

Expense and time planning and control is a part of construction project manajement. Beside the value of quality, the project achievement can be valued by the time and expense. The deviation can be valued by the time and expense. The deviation expense that has been incurred and time that has been spend to finish the project should be measured continuously towards the plan. The aim of this research is to know the performance and the prediction of finishing time using earned value method. On road improvement at Gentawangi street - Gerduren is planned to finish at 27 weeks. In the implementation, during the process from the first week until the seventh week, project has postpone. At the eighth week until twenty seventh week, the process has improvement. During the process at the first week until twenty seventh week, the first week until twenty seventh week, there is difference between schedule plan and the process. It also happen to the expense of the project.

Item Type: Thesis (Bachelor)
Uncontrolled Keywords: Earned Value, Project, Yield Value Concept, Time Control, Expense Control.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Agus Imam
Date Deposited: 02 Aug 2022 02:48
Last Modified: 02 Aug 2022 02:48
URI: https://repository.ump.ac.id:80/id/eprint/13220

Actions (login required)

View Item View Item