NUROKHMAN, WAHYU (2019) ANALISIS KINERJA SIMPANG TIGA TAK BERSINYAL JALAN RAYA PASAR PATIKRAJA. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
![]() |
Text
Wahyu Nurokhman Cover.pdf Download (3MB) |
![]() |
Text
Wahyu Nurokhman BAB I.pdf Download (1MB) |
![]() |
Text
Wahyu Nurokhman BAB II.pdf Download (1MB) |
![]() |
Text
Wahyu Nurokhman BAB III.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
Wahyu Nurokhman BAB IV.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
Wahyu Nurokhman BAB V.pdf Restricted to Registered users only Download (989kB) |
![]() |
Text
Wahyu Nurokhman Dapus.pdf Download (963kB) |
![]() |
Text
Wahyu Nurokhman Lampiran.pdf Restricted to Registered users only Download (15MB) |
Abstract
Intersection is part of a meeting between three or more road segments, where flows from various directions. At the intersection of the Patikraja market highway, conflicts often occur between currents from opposite directions that intersect each other, resulting in congestion along the intersection arm. Given these problems, it is necessary to conduct research on the performance of unsigned intersections at these intersections. To find out the performance of unsignalized T- junction on the Patikraja market highway through the large volume of traffic and the degree of saturation of the intersection.
This study used a direct survey for 2 days on April 30, 2019 and May 4, 2019 at 06.00-18.00 WIB. It was analyzed using MKJI 1997, produced data for 2019 with vehicle volume of 5400 vehicles / hour and DS = 1.50 ≥ 0.75 (saturated). So that handling was done by making scenario I, by reducing the width of the road shoulder to widen the main road B and the main road D = 2 meters and the minor road C = 75 cm the DS value = 1.41 ≥ 0.75 (saturated). Scenario II, by adding roundabouts to the intersection but it could not be done because of limited land on the road. Scenario III, technical changes to non-signalized intersections become signaled intersections by using 3 phases with the same width of road as scenario I. DS values = 0.45 ≤ 0.75 (unsaturated) are obtained. In 2024, based on predictions, the traffic volume increased to 8603 vehicles / hour and the DS value = 0.69 ≤ 0.75 but in the minor road C, DS value = 0.76 ≥ 0.75 (saturated). So that in 2024 the scenario IV will be created, with widening of the road 2 meters for the main road segments B and D. DS value = 0.56 ≤ 0.75 (unsaturated) is obtained.
Dosen Pembimbing: | Iskahar, Iskahar | unspecified |
---|---|
Item Type: | Thesis (Bachelor) |
Uncontrolled Keywords: | un-signalized intersection, traffic flow, capacity, degree of saturation |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
Depositing User: | Catur Indra Himawan |
Date Deposited: | 20 Jul 2022 07:39 |
Last Modified: | 26 Nov 2024 02:20 |
URI: | http://repository.ump.ac.id/id/eprint/12799 |
Actions (login required)
![]() |
View Item |