KURNIA, ANA (2021) ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK PEMBANGUAN KONSTRUKSI GEDUNG (STUDI KASUS PROYEK PEMBANGUNAN RUMAH SAKIT JIH PURWOKERTO). Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
ANA KURNIA COVER.pdf
Download (2MB)
ANA KURNIA BAB I.pdf
Download (1MB)
ANA KURNIA BAB II.pdf
Download (1MB)
ANA KURNIA BAB III.pdf
Restricted to Registered users only
Download (1MB)
ANA KURNIA BAB IV.pdf
Restricted to Registered users only
Download (1MB)
ANA KURNIA BAB V.pdf
Restricted to Registered users only
Download (1MB)
ANA KURNIA DAPUS.pdf
Download (1MB)
ANA KURNIA LAMPIRAN.pdf
Restricted to Registered users only
Download (10MB)
Abstract
Construction work is one of the high-risk jobs, especially during the construction
phase. The construction process, in general, is an activity that carries a high level
of risk. The situation at the project site for the Purwokerto JIH Hospital reflects a
"hard" character and the activities seem very complex and "difficult" to carry out
as long as extraordinary stamina is required from the workers who carry it out. The
construction of the JIH Purwokerto Hospital is one of the provision of facilities for
health activities.
The purpose of this research is to find out how big the risk of work accidents that
occur in construction projects. Especially in architectural work, mechanical work,
electrical and plumbing and GWT and IPAL work.
This study uses questionnaire data to obtain data from respondents on the
construction of the Purwokerto JIH Hospital. Based on the results of research on
Architectural work, MEP and GWT dan IPAL mostly obtained valid statements
because r count > r table, although there were some work items that were not valid.
In Architectural activities, MEP and GWT and IPAL obtain reliable data because
the Cronbach Alpha value is between > 0.60-0.80, for Based on the percentage
calculation results, for Architectural work the percentage is 30% which is included
in the Low category, for Electrical Mechanical Works and Plumbing get a
percentage of 33% so that they fall into the Low category, and for GWT and IPAL
jobs get a percentage of 33% which is included in the Low category as well.
| Dosen Pembimbing: | Azizi, Amris | unspecified |
|---|---|
| Item Type: | Thesis (Bachelor) |
| Uncontrolled Keywords: | Risk, safety, occupational health, JIH Purwokerto Hospital |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
| Depositing User: | Dan Kh |
| Date Deposited: | 27 May 2022 03:42 |
| Last Modified: | 31 Oct 2024 03:38 |
| URI: | http://repository.ump.ac.id/id/eprint/11695 |
