SETIAWAN, FAJAR (2019) PENGARUH PASAR CERME PURWOSARI TERHADAP KINERJA ARUS LALU LINTAS (Studi kasus :Jalan Pol. Sumarto, Baturraden). S1 thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
Preview |
Text
FAJAR SETIAWAN_ COVER.pdf Download (1MB) | Preview |
Preview |
Text
FAJAR SETIAWAN_ BAB I.pdf Download (859kB) | Preview |
Preview |
Text
FAJAR SETIAWAN_ BAB II.pdf Download (1MB) | Preview |
![]() |
Text
FAJAR SETIAWAN_ BAB III.pdf Restricted to Registered users only Download (839kB) |
![]() |
Text
FAJAR SETIAWAN_ BAB IV.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
FAJAR SETIAWAN_ BAB V.pdf Restricted to Registered users only Download (793kB) |
Preview |
Text
FAJAR SETIAWAN_DAPUS.pdf Download (880kB) | Preview |
![]() |
Text
FAJAR SETIAWAN_ LAMPIRAN.pdf Restricted to Registered users only Download (2MB) |
Abstract
Road performance is the ability of a road to serve the flow of traffic that occurs on these roads. However, if there are many side obstacles, the performance of the road will decrease. One that causes a decrease in road performance is due to market activities. In front of the Cerme Purwosari Market there are frequent traffic jams in the morning due to a decrease in road performance. This happened because of the lack of market land so that some of Cerme Purwosari's market activities were beside the road. The purpose of this study is to determine the effect of side barriers due to market activity on road capacity and to know the effect of market activities on the road that are reviewed based on the V / C ratio. The method used is a calculation according to the Indonesian Road Capacity Manual (MKJI) 1997. As a result of market activities that use part of the road as a place to sell it results in an increase in side barriers, this is indicated by higher morning barriers than day and evening. At the time of market activity the highest ratio value is 0.507, indicating that there is no capacity problem.
Dosen Pembimbing: | ANJARWATI, SULFAH | unspecified |
---|---|
Item Type: | Thesis (S1) |
Uncontrolled Keywords: | Performance, Side Obstacles, Capacity, V / C Ratio |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
Depositing User: | Iin Hayuningtyas |
Date Deposited: | 21 Mar 2022 04:06 |
Last Modified: | 05 Feb 2025 06:58 |
URI: | http://repository.ump.ac.id/id/eprint/11091 |
Actions (login required)
![]() |
View Item |