PURNOMOJATI, AGENG (2019) ANALISIS KINERJA RUAS JALAN JATISARI PURWOKERTO. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.
Preview |
Text
AGENG PURNOMOJATI_COVER.pdf Download (1MB) | Preview |
Preview |
Text
AGENG PURNOMOJATI_BAB I.pdf Download (746kB) | Preview |
Preview |
Text
AGENG PURNOMOJATI_BAB II.pdf Download (1MB) | Preview |
![]() |
Text
AGENG PURNOMOJATI_BAB III.pdf Restricted to Registered users only Download (914kB) |
![]() |
Text
AGENG PURNOMOJATI_BAB IV.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
AGENG PURNOMOJATI_BAB V.pdf Restricted to Registered users only Download (830kB) |
Preview |
Text
AGENG PURNOMOJATI_DAPUS.pdf Download (855kB) | Preview |
![]() |
Text
AGENG PURNOMOJATI_LAMPIRAN.pdf Restricted to Registered users only Download (2MB) |
Abstract
Jatisari Purwokerto Road is an undivided two-lane two-way street with a width of 5.5 metres and a length of 1.1 kilometres. The large number of vehicles passing and entering the road, especially on certain hours, as well as the bustle alongside the road influence the performance of the road itself. Therefore, an analysis study is needed to analyse the performance of Jatisari Purwokerto Road. This research is expected to be able to find out the performance of the road’s existing condition and the next 5 years’ condition. The research used a survey method. It surveys the traffic volume. The data are analysed through the Indonesia Highway Capacity Manual (1997) to obtain the value of light-vehicle’s free flow velocity (FV), Degree of Saturation (DS), and the road srvice level. The research result of the existing condition shows that the (FV) is 38.92 km/hour, the (DS) is 0.71 and the service level is C category. This means that it belongs to unsaturated condition. The analysis of the next 5 years (without any change) road performance (2024) shows that the (FV) is 38.92 km/hour, the DS is 1.19 and the service level is F category. This means that it belongs to satured condition. After two scenarios, scenario I and scenario II, were conducted, it reveals that scenario II is the best scenario (by widening the track to 8 meters, installing the traffic signs). Scenario application obtains the (FV) of 44.56 km/hour, the (DS) 0f 0.70, and the service level of C category. Thus, this means that it belongs to a stable condition.
Dosen Pembimbing: | ANJARWATI, SULFAH | unspecified |
---|---|
Item Type: | Thesis (Bachelor) |
Uncontrolled Keywords: | road performance, the free-flow velocity of light-vehicles, Degree of Saturation, road service level |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Tekniik Dan Sains > Teknik Sipil S1 |
Depositing User: | Iin Hayuningtyas |
Date Deposited: | 17 Feb 2022 03:07 |
Last Modified: | 17 Dec 2024 04:20 |
URI: | http://repository.ump.ac.id/id/eprint/10660 |
Actions (login required)
![]() |
View Item |