ANALISIS KELAYAKAN JUMLAH BUS RAPID TRANSIT (BRT) TRAYEK PURWOKERTO - PURBALINGGA

AL FAAIZ, AHMAD RIZQI (2019) ANALISIS KELAYAKAN JUMLAH BUS RAPID TRANSIT (BRT) TRAYEK PURWOKERTO - PURBALINGGA. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

[img]
Preview
Text
COVER_AHMAD RIZQI AL FAAIZ_T.SIPIL'19.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB I_AHMAD RIZQI AL FAAIZ_T.SIPIL'19.pdf

Download (548kB) | Preview
[img]
Preview
Text
BAB II_AHMAD RIZQI AL FAAIZ_T.SIPIL'19.pdf

Download (560kB) | Preview
[img] Text
BAB III_AHMAD RIZQI AL FAAIZ_T.SIPIL'19.pdf
Restricted to Repository staff only

Download (575kB)
[img] Text
BAB IV_AHMAD RIZQI AL FAAIZ_T.SIPIL'19.pdf
Restricted to Repository staff only

Download (795kB)
[img] Text
BAB V_AHMAD RIZQI AL FAAIZ_T.SIPIL'19.pdf
Restricted to Repository staff only

Download (535kB)
[img]
Preview
Text
DAFTAR PUSTAKA_AHMAD RIZQI AL FAAIZ_T.SIPIL'19.pdf

Download (536kB) | Preview
[img] Text
LAMPIRAN_AHMAD RIZQI AL FAAIZ_T.SIPIL'19.pdf
Restricted to Repository staff only

Download (5MB)

Abstract

Together with the development of Purwokerto and Purbalingga cities in both of the population and the socio-economic development, the growth of transportation facilities and infrastructure is very essential. To support this development, it is required to have sufficient transportation facilities which are accessible by all citizen. The results of calculations through Fare Box Ratio method obtained 0.83 on Lestari Muda Otobus Company (PO); 0.82 on Teguh Otobus Company; and 0.81 on Bus Rapid Transit. By determining the optimum fleet number, it was obtained that at least 1 unit of Bus Rapid Transit to serve the needs of the number of passengers and 4 units at maximum of the Bus Rapid Transit fleet at one time. Thus, 14 units of the Bus Rapid Transit provided by the government/operator had met the feasibility of the number of passengers. Besides, it also obtained calculation results by FBR (Fare Box Ratio) method of 0.83 on Lestari Muda PO; 0.82 on Teguh Muda PO; and 0.81 on BRT that the Purwokerto - Purbalingga route and vice versa experience insufficient financial income for public transportation service businesses.

Item Type: Thesis (Bachelor)
Additional Information: Pembimbing: Juanita, S.T, M.T. dan Ir. Teguh Marhendi S.T., M.T
Uncontrolled Keywords: Feasibility Analysis on Number, Fare Box Ratio, Determining the Optimum fleet number
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Iin Hayuningtyas
Date Deposited: 28 Jun 2019 01:45
Last Modified: 28 Jun 2019 01:45
URI: http://repository.ump.ac.id/id/eprint/8702

Actions (login required)

View Item View Item