PERBANDINGAN ESTIMASI BIAYA ANTARA PONDASI TIANG PANCANG DENGAN PONDASI TELAPAK KOMBINASI SUMURAN PADA PEMBANGUNAN GEDUNG 5 (LIMA) LANTAI

SUDARMAN, MAMAN (2016) PERBANDINGAN ESTIMASI BIAYA ANTARA PONDASI TIANG PANCANG DENGAN PONDASI TELAPAK KOMBINASI SUMURAN PADA PEMBANGUNAN GEDUNG 5 (LIMA) LANTAI. Bachelor thesis, UNIVERSITAS MUHAMMADIYAH PURWOKERTO.

[img]
Preview
Text
COVER_MAMAN SUDARMAN_TS'16.pdf

Download (2MB) | Preview
[img]
Preview
Text
BAB I_MAMAN SUDARMAN_TS'16.pdf

Download (543kB) | Preview
[img]
Preview
Text
BAB II_MAMAN SUDARMAN_TS'16.pdf

Download (1MB) | Preview
[img] Text
BAB III_MAMAN SUDARMAN_TS'16.pdf
Restricted to Repository staff only

Download (725kB)
[img] Text
BAB IV_MAMAN SUDARMAN_TS'16.pdf
Restricted to Repository staff only

Download (939kB)
[img] Text
BAB V_MAMAN SUDARMAN_TS'16.pdf
Restricted to Repository staff only

Download (565kB)
[img]
Preview
Text
DAFTAR PUSTAKA_MAMAN SUDARMAN_TS'16.pdf

Download (637kB) | Preview
[img] Text
LAMPIRAN_MAMAN SUDARMAN_TS'16.pdf
Restricted to Repository staff only

Download (4MB)

Abstract

Cost and time work become an important factor in considering the choice of foundation apart from considerations soil bearing capacity and depth of the groundwater table (MAT). Building construction work requires a strong structure and also efficient in terms of the need for cost effective in time and work. This study aimed to analyze the cost and time comparison between the work of the pile foundation and footplate with caisson combination on the construction of five-story building. Cost and time of work analyzed using the methods and coefficients of workers from the Indonesian National Standard (SNI 739-2008). The number of workers equated to all the foundation work which were drawn from a minimum number of workers required for the job pile foundation. From the analysis, the cost for pile foundation was Rp 1,033,335,049.62 in 167 days of work. For footplate foundation with caisson combination required a cost of Rp 860,476,416.43 in 268 days of work. Thus, the diffrence costs between the pile foundation and footplate foundation with caisson combinations was Rp 172,858,633.19 and the time difference was 101 days.

Item Type: Thesis (Bachelor)
Additional Information: Pembimbing: Amris Azizi, S.T.,M.Si. dan M. Agus Salim. A, S.T.,M.T.
Uncontrolled Keywords: Cost estimation, Pile foundation, Footplate foundation, Caisson
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Iin Hayuningtyas
Date Deposited: 30 Oct 2017 03:37
Last Modified: 30 Oct 2017 03:37
URI: http://repository.ump.ac.id/id/eprint/5034